Refurbishment budgets: what to spend on first

Ordering a refurbishment so nothing gets ripped out twice.

The fastest way to waste money on a refurbishment is to decorate before the boring work is done. Fabric first, then services, then finishes — in that order — means nothing gets opened back up after it has been painted.

Fabric first

Roof, gutters, damp, windows and any structural movement come before anything cosmetic. These are the items that damage finished work if left.

Services second

Rewiring, heating and plumbing all involve chasing walls and lifting floors. Getting them done before plaster and flooring avoids paying for the same surfaces twice.

Plaster and joinery

Skim coats, stud walls, doors, skirtings and architraves come next, sequenced so plaster dries properly before decorators start.

Finishes last

Decoration, flooring, tiling and sanitaryware are the visible spend, and they are also the easiest place to phase over time if the budget is tight.

Common questions

Questions we get asked about this

Can a refurbishment be phased?

Yes. Phasing room by room is common, particularly where the family is living in the property. We plan the sequence so you are never without a kitchen and a bathroom at once.

Do you handle decorating?

We work with decorators on most jobs, so quotes are usually turnkey unless you would rather arrange painting yourself.

Can you refurbish an occupied house?

Yes. Working areas are sealed with dust protection and cleaned daily, and the programme is arranged around the rooms you need.

Is a partial rewire acceptable?

Sometimes. It depends on the age and condition of the existing installation, which an electrician assesses before we finalise scope.