Planning a kitchen renovation budget that survives the build

Separating the units budget from the building work budget.

Most kitchen budgets are set by the showroom quote, which covers units, worktops and appliances. The building work around it — electrics, plumbing, plastering, flooring, and any structural change — is a separate budget entirely, and it is the one that usually gets squeezed.

Split the two budgets from the start

Decide early what the supplier is providing and what the builder is doing. Most customers buy their kitchen directly and have us install and carry out the building work, which keeps both sides transparent.

Electrics are rarely a like-for-like swap

New layouts almost always mean new circuits, more sockets, under-unit lighting and appliance-specific supplies. Older properties may need a consumer unit upgrade before any of that is signed off.

Moving water and waste

Relocating a sink or dishwasher depends on being able to run waste with enough fall to the stack. On a suspended floor that is usually straightforward; on a solid slab it can mean chasing or re-routing at a real cost.

Lead times are part of the budget

Worktop templating typically happens after units are fitted, and the fabrication window sits in the middle of your project. Planning around it avoids paying for a trade to stand still.

Common questions

Questions we get asked about this

Should I buy the kitchen or should you?

Either works. Many customers buy from a national supplier and we install; if you prefer, we can handle procurement instead.

How long will we be without a kitchen?

A straight-swap refit is normally a few weeks. If walls are moving or an extension is involved, plan for considerably longer and set up a temporary kitchen elsewhere in the house.

Can you do the knock-through as part of the kitchen job?

Yes — combining the structural opening and the kitchen fit into one project is the most common way we work, so one contractor is responsible from strip-out to worktop.

Do you provide certification?

Electrical and gas work is carried out by registered trades and certification is issued at the end of the job.