Renovating before you move in

An empty house is the cheapest house to work on.

Work carried out in an empty property runs faster, costs less in protection and disruption, and avoids the compromises that come with living around a building site. If your circumstances allow it, the window between completion and moving in is worth using.

Why empty is cheaper

No furniture protection, no dust curtains, no working around bedtimes, no partial rooms. Trades overlap more efficiently and the programme compresses.

What to prioritise

Anything disruptive: rewiring, plastering, structural openings, floor finishes and bathrooms. Decoration and joinery details can follow later.

  • Rewiring and heating alterations
  • Structural openings and knock-throughs
  • Whole-floor coverings
  • Bathroom and kitchen work

Planning around completion

Survey before completion where the vendor allows, so the quote is ready and the work can start immediately on key handover.

Know your limits

If the window is short, be realistic about what fits. A rushed programme costs more than a phased one.

Common questions

Questions we get asked about this

Can you quote before I complete?

Where the vendor allows access, yes — that is the ideal, because work can begin as soon as the property is yours.

How long is a typical pre-move refurbishment?

It depends on scope, but a focused programme of the disruptive items is often a matter of weeks rather than months.

Should the kitchen go in before we move?

If the budget allows, yes. Kitchen work is the most disruptive thing to live through.

Can work continue after we move in?

Yes, and phasing that way is common. We sequence so nothing needs redoing.

Just bought, or about to?

Get the quote ready before completion so the work starts on day one.